first completed residential installation in
Cambridge, Massachusetts - July 11, 2003
 |
2.18kW system at
93 Larch Road Cambridge
Paul Lyons of Zapotec Energy discussing the installation
with home owner Jack Turner. |
 |
Lighthouse Electrical Contracting ready to start work at 7AM |
 |
Cutting the rails as specified on the roof layout sketch. |
|
Checking the Open Circuit DC voltage from solar panel to make
sure it is acceptable for mounting on the roof. |
|
Carrying each panel up to the roof
|
 |
Installing panels on the roof. |
 |
The DC disconnect switch, the DC to AC inverter , solar power
production meter and circuit breaker in homeowner's service
panel are istalled |
 |
NSTAR performs Acceptance test at utility disconnect switch
located to the left of the utility electric meter.
NSTAR accepts the photovoltaic system - 9: 45 AM July 13,
2003 |
|