Our first completed residential installation in
Cambridge, Massachusetts - July 11, 2003

2.18kW system at

93 Larch Road Cambridge

Paul Lyons of Zapotec Energy discussing the installation with home owner Jack Turner.

Lighthouse Electrical Contracting ready to start work at 7AM
Cutting the rails as specified on the roof layout sketch.
Checking the Open Circuit DC voltage from solar panel to make sure it is acceptable for mounting on the roof.

Carrying each panel up to the roof

 

Installing panels on the roof.
The DC disconnect switch, the DC to AC inverter , solar power production meter and circuit breaker in homeowner's service panel are istalled

NSTAR performs Acceptance test at utility disconnect switch located to the left of the utility electric meter.

NSTAR accepts the photovoltaic system - 9: 45 AM July 13, 2003


 